The process of building scaffold

Your current location: Home >> News >> technical knowledge

The process of building scaffold

Date:2017-03-27 Author:Nanyang Lingyu Machinery Co. Ltd Click:

      1、Shelf erection process:

  In the foundation, elastic solid pole line positioning, sweeping bar, placed vertical rod and rod fastening, with sweeping sweeping the small bar, and the vertical rod and the rod fastened to the first step of sweeping a large bar and the pole fastened to a small bar, an ANN first step second step, second step large bar a small bar, and a temporary rod, and the upper end of the second step (a large bar fastening assembly and column connecting rod removed), an third, fourth step large and small bar, bar and column bars to install two layer connection pole, adding shear bracing - paving scaffold, lashing protection and toe board, hanging safety net。

  2、The joint of frame and building (flexible tie)

  The components are made up of 6 steel bars, top supports and steel pipes, in which the steel bars bear tensile force, and the pressure is transmitted by the top support and the steel pipe。