新闻中心

News

Product Categories

Hot Key Words

Contact Us

Nanyang Lingyu Machinery Co., Ltd.

Phone:(86377)60209597 138 4979 0183  135 2567 9131

Tel of Sales Department: 186 0377 9722 156 6066 1627

Address: No. I West Zone of Wenzhou Industrial Park,Liuquanpu Town, Zhenping County, Nanyang City

Website:http://www.nyslyjt.com

E m a i l:Yangxf2002009@126.com

      3274495771@qq.com


Nine advantages of aluminum formwork

Your current location: Home >> News >> Industry news

Nine advantages of aluminum formwork

Date:2017-11-15 Author:Nanyang Lingyu Machinery Co., Ltd. Click:

      1. short construction period

       Building formwork system Aluminum Alloy for quick release system, 24 hours can be removed after pouring the concrete wall column template can be removed after 36 hours of beam side, 48 hours can be removed, beam bottom plate bottom template (non bearing), 12 days after the demolition of bottom bearing pillar, 14 days after the demolition of bottom bearing pillar, 28 days after the demolition of the cantilever pillar. The normal construction of a set of aluminum alloy formwork can reach three or four days and one layer, greatly saving the management cost of the construction unit.



2. the number of repeat use is more, the average cost is low

The building template system Aluminum Alloy using Aluminum Alloy section integral extrusion formed as raw materials (6063-T6 and 6061-T6), Aluminum Alloy template size specifications of the various processing required, a set of Aluminum Alloy template construction specifications can be recycled 200-400 times, the average low use cost。

3.The construction is convenient and efficient

Building formwork system Aluminum Alloy assembly is simple and convenient, the average weight in 25KG/ square meters, completely by manual assembly, does not require any assistance from mechanical devices (construction workers usually require only a small hook, a small hammer can be conveniently installed) skilled workers per person per day can be installed 20-30 square meters (wood and contrast, aluminum mould installation workers to wood installation workers 70% -80%, and does not require skilled workers, only for construction personnel can be simple training before installation)。

4.It has good stability and high bearing capacity

All parts of the aluminum alloy building formwork system are assembled by aluminum alloy template. After the system assembly is completed, a whole frame is formed, the stability is good; the reasonable layout of the load-bearing pillar, the bearing capacity can reach 30KN per square meter。

5.It has wide application range and high recovery value

Aluminum Alloy construction formwork used in wall, column, beam, floor level, stairs, window, floating plate location; Aluminum Alloy building template scrap, when residual waste treatment, share the cost advantage is obvious。

6.After the removal of mixed soil surface effect

After pouring concrete, the concrete surface quality of the aluminum alloy building formwork is smooth and smooth, and the requirement of the finish and fair faced concrete can be basically achieved。

7.Site convenient management

All the fittings of the aluminum alloy building formwork system can be reused. After the construction, installation and dismantling of the aluminum alloy template, there is no rubbish on the spot, and the construction environment is safe, clean and tidy。

8.Standard, versatility, low carbon emission reduction

The size of aluminum alloy building template is large and can be assembled with different specifications according to the project. When the used formwork is applied to the new construction project, only about 20% non-standard template is replaced, which can effectively reduce the cost. Aluminum alloy building formwork system all materials are renewable materials, in line with the national construction project energy saving, environmental protection, low carbon emission reduction regulations. Many developed countries have stipulated that the construction projects are not allowed to use wooden formwork again, and the templates of renewable materials should be used。

9.The support system is convenient

The construction method of the traditional wooden template construction technique of floor platform, ordinary full use of stents, labour and material consuming, no operation space。


Tags:Ringchainelectrichoist

Browse:

Products:

News:

联系我们
Share