新闻中心

News

Product Categories

Hot Key Words

Contact Us

Nanyang Lingyu Machinery Co., Ltd.

Phone:(86377)60209597 138 4979 0183  135 2567 9131

Tel of Sales Department: 186 0377 9722 156 6066 1627

Address: No. I West Zone of Wenzhou Industrial Park,Liuquanpu Town, Zhenping County, Nanyang City

Website:http://www.nyslyjt.com

E m a i l:Yangxf2002009@126.com

      3274495771@qq.com


Concrete mixing in winter construction of aluminum formwork

Your current location: Home >> News >> Company news

Concrete mixing in winter construction of aluminum formwork

Date:2017-11-15 Author:Nanyang Lingyu Machinery Co., Ltd. Click:

  1、concrete mixing with the aggregate must be clean, and shall not contain ice and frozen blocks, as well as the material easy Donglie. In mixed with potassium, sodium ion additive, may not use the active aggregate. When conditions. Sand washing should grab the temperature at zero time, and with plastic paper, cloth cover.


  2、mixing admixture of concrete admixtures, such as powder, according to the requirements of content directly and input at the same time in the cement and cement admixture. As for the above liquid, should be used to prepare a specified concentration solution, and then according to the requirement, using the specified concentration solution prepared in aqueous solution. The solution to the container construction in marked, not confusion. Each class using a mixed solution should be additive. 


  3、when the construction period is about 0 degrees Celsius, can add Earlystrength agent in concrete, admixture shall comply with the requirements and regulations, and should be paid attention to in addition should be prepared before the experiment, to verify the relevant technical measures for a limited period; removal of concrete requirements, should also be appropriate to improve design level of concrete.


  4、the use of antifreeze in concrete, strictly prohibit the use of high alumina cement.   


  5、Strictly control the water cement ratio of concrete, the moisture from aggregate and the water in admixture solution should be deducted from mixing water.


  6、When mixing concrete with admixture, the mixing time should be 1.5 times of the mixing time at normal temperature.  


  7、the concrete mixer temperature should not be lower than 10 degrees, the mold temperature shall not be less than 5 degrees

Tags:施工升降机

Browse:

联系我们
Share