产品中心

Product

Hot Key Words

Contact Us

Nanyang Lingyu Machinery Co., Ltd.

Phone:(86377)60209597 138 4979 0183  135 2567 9131

Tel of Sales Department: 186 0377 9722 156 6066 1627

Address: No. I West Zone of Wenzhou Industrial Park,Liuquanpu Town, Zhenping County, Nanyang City

Website:http://www.nyslyjt.com

E m a i l:Yangxf2002009@126.com

      3274495771@qq.com


Construction elevator

Your current location: Home >> Products >> Construction elevator

    Construction elevator

  • Category:Construction elevator

  • Release date:2017/10/12
  • The number of clicks:
  • National 24-hour service hotline:0377-83983166
  • Immediate inquiry>
  • Online consultation>
  • Features
  • Configuration parameters
  • Construction Cases
  • Troubleshooting

SC200/200 construction elevator has the advantages of simple operation, stable operation, complete performance, dual-use goods, safe and reliable, assemble and convenient transportation, lifting speed, long life and other advantages, is the ideal vertical transportation equipment. Design height: 150 meters, load, 2 tons per cage.

Product characteristic

Installation, disassembly and maintenance are convenient

Direct start braking

The utility model has the advantages of simple structure and low cost

Perfect mechanical and electrical safety protection device

Overload protection device

Standard anti drop safety device

Optional floor call system

The main parts

Safety anti falling device

Limit switch

Drive asynchronous motor

Standard section

Cab

High strength rack


英文版施工升降机.fw.png

blob.png

1. before each installation and disassembly of the construction hoist. The installation and disassembly plan shall be worked out according to the working environment and auxiliary equipment at the construction site, and may be implemented after approval by the technical director.


2., each installation or demolition operations, the operators should be in accordance with different types of work and job content for detailed technical, safety disclosure. The personnel involved in the assembly and disassembly must have a special qualification certificate.


3. after each installation of the lift, the construction enterprise shall organize the functional departments and professionals to carry out necessary tests and acceptance of the lift. After confirmation of the case, it shall be reported to the testing institution as determined by the local construction administrative department, and shall be used after the professional testing institution has passed the test


4. construction hoist in accordance with the pre operation. All parts are as follows to lift their check


(1) complete sets of guide rail frame, cage and other metal structure and integrity


(2) assembly accuracy and contact length of gear speed limiter in transmission system;


(3) whether the main circuit and control circuit of the electrical equipment conform to the product standards stipulated by the state?


(4) based on the design requirements. It is conform to the tree of the product


(5) whether the concrete strength and the bolt hole at the setting of the wall bracket are matched with the installation condition of the platform;


(6) whether the safety device is complete, whether the installation position is correct and firm, whether the stop switch is sensitive and reliable


(7) are there any factors affecting the operation safety of the elevator installation environment?


5. installation should be strictly in accordance with the implementation and installation process in advance of the program requirements for the personnel unified installation process releasing muddy, designated warning area. And blind surveillance by hand


6. installation and disassembly should be carried out during the day, and bad weather should be stopped.


7. the operator shall fasten the seat belt according to the requirements of the bureau.


8. the object is not to be thrown down from the top when dismounting.