新闻中心

News

Product Categories

Hot Key Words

Contact Us

Nanyang Lingyu Machinery Co., Ltd.

Phone:(86377)60209597 138 4979 0183  135 2567 9131

Tel of Sales Department: 186 0377 9722 156 6066 1627

Address: No. I West Zone of Wenzhou Industrial Park,Liuquanpu Town, Zhenping County, Nanyang City

Website:http://www.nyslyjt.com

E m a i l:Yangxf2002009@126.com

      3274495771@qq.com


Process principle and process flow of aluminum die

Your current location: Home >> News >> Company news

Process principle and process flow of aluminum die

Date:2017-03-27 Author:Nanyang Lingyu Machinery Co. Ltd Click:

Process principle
       The aluminum alloy formwork system is the standard size template structure and the non-standard components which are used in the actual project according to the engineering construction and structural construction drawings, through the formalization design and the industrialized processing customization. First, according to the design drawings, the pre assembly is completed in the factory. After the engineering requirements are met, the partition of the template components and the classification of the units are marked accordingly. The template material transported to the site, according to the template number "seats" were installed. After installation, the vertical and vertical adjustment of the formwork can be adjusted by the adjustable inclined support; the horizontal elevation of the formwork can be adjusted by supporting; the rigidity and the overall stability of the formwork system can be ensured by using the through wall to pull the screw and the back face. In the concrete strength reach the stripping strength, keep the vertical support according to the template, Liang Cemo wall and floor mold in order to quickly enter the cycle of demolition, construction of the next layer.
Technological process
       The measurement line, the wall column rebar --- embedded reserved, concealed engineering acceptance, walls, beams and plates Aluminum Alloy template installation Aluminum Alloy template installation, Aluminum Alloy reinforcement, beam plate correction template rebar --- to reserve embedded hidden works acceptance, concrete pouring and curing and Aluminum Alloy template removal, Aluminum Alloy template Daoyun