Nanyang Lingyu Machinery Co., Ltd.
Phone:(86377)60209597 138 4979 0183 135 2567 9131
Tel of Sales Department: 186 0377 9722 156 6066 1627
Address: No. I West Zone of Wenzhou Industrial Park,Liuquanpu Town, Zhenping County, Nanyang City
Website:http://www.nyslyjt.com
E m a i l:Yangxf2002009@126.com
3274495771@qq.com
1、the formulation of construction technical measures (measures) must be based on the premise of ensuring the construction quality and production safety, and has certain technical reliability and economic rationality.
2、the construction technology scheme (measures), which has the following contents: construction plan (schedule), construction procedure, construction methods, materials and equipment deployment plan, technical training of construction personnel, enter the winter before construction, construction management personnel, personnel training for temperature assessment, the main construction management personnel training including content: learning about the winter construction norms and regulations; winter construction principles set by the company, winter construction methods and technical measures of the main; learning new technology to be used in winter construction;
3、learn the daily management of winter construction and fire safety measures. Measuring staff training should include: to understand the significance and importance of measurement work, enhance the sense of responsibility, learning to use the various measuring instruments, learning sub project measurement requirements, learning record temperature data and fill out the form. At the same time, before the winter construction of technical disclosure work. Labor plan, thermal insulation material and admixture material plan, operation points, quality control points, testing items and so on.